Project Overview
We successfully delivered a 217.8kWp solar photovoltaic (PV) system at UTAC Millbrook, a leading automotive testing and technology facility. The installation consisted of 484 high-efficiency solar modules, covering a total area of 967.1m², designed to significantly reduce the site’s carbon footprint and energy costs.
Scope of Works
Our team was responsible for the complete design, supply, and installation of the DC and AC systems, including:
- Mounting and cabling of 484 solar panels
- Installation of inverters and DC isolators
- Testing, commissioning, and system verification in accordance with current electrical standards
System Details
- Total Capacity: 217.8kWp
- Number of Modules: 484
- Total Array Area: 967.1m²
- Specific Annual Yield: 916.41 kWh/kWp
- Estimated Annual Generation (AC Grid): 199,749 kWh
- Inverter Type: High-efficiency string inverters with integrated monitoring
- Mounting System: Roof-mounted, corrosion-resistant containment
Challenges & Solutions
Working within an operational automotive testing environment required careful planning and coordination. Specifically due to the confidential nature of the sight. We scheduled works to minimise disruption to daily site activities and ensured all safety protocols were followed rigorously.
Additionally, precision in cable management and installation was critical for long-term maintenance efficiency - achieved through meticulous planning and quality assurance inspections.