Project Overview
We successfully installed 4,354.6m² of solar photovoltaic (PV) systems across the roofs of sawmill warehouse buildings, delivering a sustainable and efficient energy solution to support site operations. This project enhances energy efficiency, reduces reliance on conventional power sources, and contributes to long-term cost savings while maximising the use of renewable energy.


Scope of Works
Our team was responsible for the design, supply, and installation of the full PV system, including:
- Mounting and cabling of 2,230 high-efficiency solar panels across multiple warehouse roofs
- Installation of inverters and DC isolators
- Testing, commissioning, and verification to ensure compliance with all relevant electrical and safety standards
System Details
- PV Generator Output: 925.45kWp
- Number of Modules: 2,230
- Total Array Area: 4,354.6m²
- Specific Annual Yield: 807.16 kWh/kWp
- Estimated Annual Generation (AC Grid): 747,577 kWh
- Inverter Type: High-efficiency string inverters with integrated monitoring
- Mounting System: Roof-mounted, corrosion-resistant containment
Challenges & Solutions
Working across multiple warehouse roofs required careful logistical coordination and rigorous adherence to health and safety protocols. The installation team ensured that all work was carried out with minimal disruption to site operations, while maintaining efficient progress and consistent quality standards.
Effective project management and clear communication with site representatives ensured smooth delivery from start to finish.
Outcome
The installation provides a reliable, clean energy source that supports the sawmill’s operations while reducing overall energy costs and environmental impact. The system contributes directly to the company’s sustainability objectives, promoting long-term energy independence through the adoption of renewable technology.